Section 4.5: Are there some words missing in the example given in the following sentence?
Current:
An application that uses QUIC and communicates a cumulative stream
limit might require the connection to be closed before the limit is
reached, e.g., to stop the server to perform scheduled maintenance.
Perhaps (adding "in order"):
An application that uses QUIC and communicates a cumulative stream
limit might require the connection to be closed before the limit is
reached, e.g., to stop the server in order to perform scheduled
maintenance.
Section 4.5: Are there some words missing in the example given in the following sentence?
Current: An application that uses QUIC and communicates a cumulative stream limit might require the connection to be closed before the limit is reached, e.g., to stop the server to perform scheduled maintenance.
Perhaps (adding "in order"): An application that uses QUIC and communicates a cumulative stream limit might require the connection to be closed before the limit is reached, e.g., to stop the server in order to perform scheduled maintenance.