currently, in evaluate missing scores are essentially ignored. there should be a penalty for this.
I think one option is to scale each value in the roc output by the percent of scored variants, so if only 20% of variants are scored, then the maximum ROC curve will be 0.8
currently, in
evaluate
missing scores are essentially ignored. there should be a penalty for this. I think one option is to scale each value in the roc output by the percent of scored variants, so if only 20% of variants are scored, then the maximum ROC curve will be 0.8