quintel / etmodel

Professional interface of the Energy Transition model.
https://energytransitionmodel.com/
MIT License
26 stars 12 forks source link

merit order for hydrogen production does not refresh after adding flexible production capacity #4247

Open AlexanderWirtz opened 5 months ago

AlexanderWirtz commented 5 months ago

After I add additional flexible H2 production capacity, the merit order does not update automatically. Step 1:

image

Step 2:

image

I need to refresh the page to see the installed 5 GW:

image

The H2 supply and demand balance does respond to the setting of this slider, so I think this is more a cosmetic problem, than a problem with the calculation not updating after the additional capacity is installed.

Notifying @kaskranenburg and @kndehaan

Re-assign as needed

kndehaan commented 5 months ago

Is see that this problem also occurs in the district heating merit order sections. Perhaps other merit orders as well (how many more do we have)?

This problem doesn't occur in the electricity storage merit order where the merit order is 'refreshed' (calculated) when you got to > Merit order:

image

Whereas if you go to merit order section in hydrogen or district heating, the merit order is not 'refreshed' and will only refresh if you take an action that induces a recalculation (such as setting a slider or refreshing page). Therefore, there's this 'delay' in updating the merit order as depicted by Alex.

github-actions[bot] commented 1 month ago

This issue has had no activity for 60 days and will be closed in 7 days. Removing the "Stale" label or posting a comment will prevent it from being closed automatically. You can also add the "Pinned" label to ensure it isn't marked as stale in the future.

mabijkerk commented 1 month ago

Already adressed in https://github.com/quintel/etmodel/issues/4273