Figure 5: The variation in the time taken for the DEM simulation of 2 mm particles as a function of number of cores.
Please use modified opening line as above.
The speed increase on increasing the number of cores from 1 to 16 was higher than the speed improvements observed from increase of cores from 16 to 256.
The above needs to be said better!!
The y-axis label refers to minutes. Is this correct. E.g., 3000 minutes --> 50 hours. Please confirm.
I did not understand your first point. Does it need to be changed or that statement is okay?
I have modified the latter statement and yes the y-axis is in minutes.
Figure 5: The variation in the time taken for the DEM simulation of 2 mm particles as a function of number of cores.
The speed increase on increasing the number of cores from 1 to 16 was higher than the speed improvements observed from increase of cores from 16 to 256.
The above needs to be said better!!
The y-axis label refers to minutes. Is this correct. E.g., 3000 minutes --> 50 hours. Please confirm.