Closed pchainho closed 9 years ago
Runtime SOTA cleaned
Project Wonder SOTA cleaned but not M2M related projects:
@aoncorici, as previously discussed, could you consolidate the three contributions we have now:
https://github.com/reTHINK-project/core-framework/blob/master/docs/sota/projects/ETSI_oneM2M.md
in one and move the ones more related with back-end catalogue to wp4?
Done.
As of today, this information does not fit into the D4.1 ToC. So I leave 'em here.
A more general issue, we should be aware of: Is a tighter alignment of the (interface) specification among all technical WPs required?
I am just asking this as I saw that for D4.1, interface spec of the catalogue, I could easily reference agreed data models / structures and interfaces from D2.2.
Also, if we start developing in WP-3, the interfaces between e.g. WP-3 and WP-4 components should be engraved in stone before.
Best
marc
On 14 Sep 2015, at 17:05, pchainho notifications@github.com wrote:
Project Wonder SOTA cleaned but not M2M related projects:
@aoncorici, as previously discussed, could you consolidate the three contributions we have now:
https://github.com/reTHINK-project/core-framework/blob/master/docs/sota/projects/ETSI_oneM2M.md
in one and move the ones more related with back-end catalogue to wp4?
� Reply to this email directly or view it on GitHub.
Also, if we start developing in WP-3, the interfaces between e.g. WP-3 and WP-4 components should be engraved in stone before.
They are not engraved in stone but should be the basis to enable us to start implementing. We will probably need to adjust them as we progress in more detailed design and development.
Contact original contributors if needed
https://github.com/reTHINK-project/core-framework/tree/master/docs/sota/runtime
https://github.com/reTHINK-project/core-framework/tree/master/docs/sota/projects
Complete summary with Fokus projects