Open ricardoboss opened 1 year ago
Each PR should have a checklist with required items so nothing is forgotten before merging.
Such a list could contain the following items:
Things like the pipeline succeeding don't need to be added since they are checked anyway.
Each PR should have a checklist with required items so nothing is forgotten before merging.
Such a list could contain the following items:
Things like the pipeline succeeding don't need to be added since they are checked anyway.