Closed rbradford closed 1 year ago
Now that the checks for commit buildability run older to newest (HEAD) if this check is done ahead of the general build step then on PR builds the build step will become an effective no-op reducing the total time to run a PR based build.
Signed-off-by: Rob Bradford rbradford@rivosinc.com
Now that the checks for commit buildability run older to newest (HEAD) if this check is done ahead of the general build step then on PR builds the build step will become an effective no-op reducing the total time to run a PR based build.
Signed-off-by: Rob Bradford rbradford@rivosinc.com