robertmetzinger / ar-maintenance-assistant

This repository serves to manage the requirements for the project Maintenance Assistant | AR/VR Assistant for maintenance operators.
0 stars 0 forks source link

Q1: Feedback constraints #18

Open kevinMerizalde opened 1 year ago

kevinMerizalde commented 1 year ago

The update of the feedback to the DB needs to be available within 5 minutes after finishing the maintenance. The update of the logs of the DB needs to be overnight update