Closed rogerlew closed 2 years ago
go with wepp watershed
set up interface to use 10m DEM and upscale to 2m. have user upload vector layer and drop by 0.1 m or a specified amount.
are they acting like hillslopes or channels
look for impoundments database from shui from old online interface code. have to know how the water backs up
purpose
pre-fire, post-fire, 1, 2 and 3 years post fire
post salvage classified based on ndvi level of soil disturbance and cover
skid trial, bare soil (some with slash), control plots
DEM 2m