Closed ronnyhdez closed 2 months ago
I have created first a buffer around the abandoned well polygons of 60m. Then I created a buffer around that first buffer of 200m. On issue ref #90, RF wrote:
Create a buffer polygon >60m and <200m from the original reclamation polygon and set an attribute corresponding to the reclamation polygon area. This will be the reference polygon.
Are those the buffer distances we want?
As a result, this is what I obtained:
The red squared polygon is the abandoned well polygon. The black section is the reference buffer (200m) and the space between the red abandoned well polygon and the reference polygon is the buffer area of 60m.
This is how they look when exporting asset to GEE
Ref #111
According to ref #6