scylladb / scylla-manager

The Scylla Manager
https://manager.docs.scylladb.com/stable/
Other
48 stars 33 forks source link

fix(restore): post-restore repair to use max intensity and parallel #3832

Closed karol-kokoszka closed 1 month ago

karol-kokoszka commented 2 months ago

Fixes #3823 Fixes #3542


Please make sure that:

Michal-Leszczynski commented 1 month ago

The reason for repair test failure: #3834.

Michal-Leszczynski commented 1 month ago

I'm fine with this change and I actually created identical PR in the past that was rejected because this comment. Did we validate that sctool repair control works on restore repair as intended? Or maybe this change should be introduced only alongside #3666?

karol-kokoszka commented 1 month ago

Right, would be good to have the repair control available for this post-restore. Let's discuss on grooming.

karol-kokoszka commented 1 month ago

@Michal-Leszczynski did you have a chance to check if repair control works when the post-restore repair is on-going ?

karol-kokoszka commented 1 month ago

OK, it is updating the port-restore repair.