Making this change in addition to change made last week. The 'every hour' sync verbiage is used in this section as well.
These changes were made because the default compute frequency for audiences is set to 8 hours and various factors may influence the sync frequency as well, being that this is a list-destination.
I've removed the 'Every hour' verbiage, as we should not have absolute value in the doc per Engineering.
Proposed changes
Making this change in addition to change made last week. The 'every hour' sync verbiage is used in this section as well.
These changes were made because the default compute frequency for audiences is set to 8 hours and various factors may influence the sync frequency as well, being that this is a list-destination.
I've removed the 'Every hour' verbiage, as we should not have absolute value in the doc per Engineering.
Merge timing
Related issues (optional)