The broken line in the case is 22 (3 to 23). And the generator is only attached to 1.
My question:
what's happening with the 25-29 line, initially it was opened, but was it closed after reconfiguration, as it shows a dotted line? Also, why does it not supply to node 24 23?
Why did 9 15 tie switch close and the 14 15 switches get opened?
Can you please explain me this?
This is due to the constraint on the maximum power capacity of the lines. If we assume sufficient power transmission capability for each line, bus 23/24 could be picked up.
The resilience reconfiguration problem is rather intricate, with numerous influencing factors. You might consider introducing a constraint to keep the 14-15 line closed, then examine if this affects the objective function at the optimal solution.
The broken line in the case is 22 (3 to 23). And the generator is only attached to 1.
My question:
what's happening with the 25-29 line, initially it was opened, but was it closed after reconfiguration, as it shows a dotted line? Also, why does it not supply to node 24 23?
Why did 9 15 tie switch close and the 14 15 switches get opened? Can you please explain me this?