Closed kmharrington closed 8 months ago
These are in the schedule files, we should look at following them. (not trivial, need to make sure detectors are set up for the correct boresight).
These are in the schedule files, we should look at following them. (not trivial, need to make sure detectors are set up for the correct boresight).