Closed adbr8389 closed 11 months ago
That's a question to @kaolpr. He produces it currently.
We're expecting to have prototypes in ca 6 weeks. After that we'll need some time (+ca 4 weeks) to test and verify hardware and firmware.
Great, thanks for the response.
@kaolpr I am getting some impression of the status of the shuttler prototyping from the issues - seems like progress is being made but things are still firmly in the prototype and debug stage. Could you quickly give me a (short) coherent story of what is happening on your end? Thanks!
Well, we do have v1.0 up and running. At TechnoSystem we used Digilent Genesys 2 with some minimal sample lookup table based firmware to evaluate the output signal.
Some hardware issues were identified and already fixed for v1.1 (https://github.com/sinara-hw/Shuttler/issues/30). Beside that, an issue with bandwidth was identified (https://github.com/sinara-hw/Shuttler/issues/36). Hope to have a decision on fix / nofix soon (you're welcome to contribute).
We did not test AFE at TechnoSystem yet.
Ongoing efforts:
We're hoping to start v1.1 manufacturing (i.e. PCB ordering) in ca 3 weeks from now.
@gkasprow @tprzywoz we (Ions storage) are curious if there any updates regarding the status of the shuttler design