This repository hosts the District's Regulatory automated tool to calculate changes in groundwater availability and other drawdown effects due to well additions or deletions (cup - consumptive use permit) within the NFSEG groundwater model.
Currently, the upstream_gages file that maps what gages need to be summed to calculate the change in flow at a given gage location only includes SR gages, and those may only be the subset used as model calibration targets. For the Reg Tool and future Planning Tool the list needs to be complete: all SR and SJR gages. The remaining gages need to be mapped and added to the file
Original issue opened Nov 19, 2020 by @pbremner-sjr
Currently, the upstream_gages file that maps what gages need to be summed to calculate the change in flow at a given gage location only includes SR gages, and those may only be the subset used as model calibration targets. For the Reg Tool and future Planning Tool the list needs to be complete: all SR and SJR gages. The remaining gages need to be mapped and added to the file
Original issue opened Nov 19, 2020 by @pbremner-sjr