I'm testing ska_mid/tm_subarray_node/1 and ska_mid/tm_subarray_node/2, with the status OFF. The AssignResources command is disabled.
I checked the code and the method is_AssignResources_allowed disables the command only in FAULT, UNKNOWN, DISABLE, STANDBY.
Need to investigate why the command is disabled.
I'm testing ska_mid/tm_subarray_node/1 and ska_mid/tm_subarray_node/2, with the status OFF. The AssignResources command is disabled. I checked the code and the method is_AssignResources_allowed disables the command only in FAULT, UNKNOWN, DISABLE, STANDBY. Need to investigate why the command is disabled.