Open Mateo9569 opened 1 year ago
Thanks Matteo.
There is no schedule for creating/submitting PSCIS fixes (and I'm not under contract with the province currently anyway) - so this is not going to be fixed in the source db any time soon.
However! I can easily prevent it from coming through into bcfishpass.crossings etc. I'll do that but leave this open as a reminder.
I'm going to re-assign this one to @captainmarmot 😃
stream_crossing_id
: 198380, Five Mile CreekA phase 1 submission sheet was submitted to PSCIS yesterday (April 27) containing one crossing that was surveyed in 2022 for the Ministry of Transportation. There is a mistake in the UTM field. The value inputted was 9 when it should have been 10. This submission needs to be removed from the system.