Closed cormier closed 6 years ago
Add tests to the project.
This PR builds on top of work done in #35 and #33 and should be reviewed after those two PRs are reviewed. It implements everything required to start work on #4.
This PR does the following:
I rebased the PR on master and it is ready to be reviewed.
Add tests to the project.
This PR builds on top of work done in #35 and #33 and should be reviewed after those two PRs are reviewed. It implements everything required to start work on #4.
This PR does the following: