sostenibilidad-unam / layers

data layers
GNU General Public License v3.0
0 stars 0 forks source link

Report results of drainage connectivity #67

Open paola-gp opened 6 years ago

paola-gp commented 6 years ago

Deliverables:

  1. Table of synthesis per AGEB of connectivity indicators.
  2. Report with metadata of table and method.
duoai1206 commented 6 years ago

@PaolaGomezPriego @abaezacastro @marcoajh @yosunemiquela @heakin

I have uploaded the data that is final and to be used for contingency matrices for infrastructure decision criteria vs ponding events. Please develop a matrix for each metric, in total of 6 - Capacity, Density, Total degree, Weighted total degree, Weighted normalized betweenness, Weighted standardized betweenness.

  1. Table of synthesis per AGEB of connectivity indicators. Path in Dropbox: MEGADAPT_Yeowon>Sewee_netowork_october2017>Tables for Contingency Matrix>Final Data (Link)
  2. Report with metadata of table and method. Path in Dropbox: MEGADAPT_Yeowon>Sewee_netowork_october2017>Tables for Contingency Matrix>Final Data (Link)
paola-gp commented 6 years ago

@edithvilla

edithvilla commented 6 years ago

@duoai1206 @lancis-apc @heakin

Hi Yeowon:

  1. In the table of synthesis per AGEB of connectivity indicators, i added a column with comments that are important to be able to complete the methodology Path in Dropbox: MEGADAPT_Yeowon>Sewee_netowork_october2017>Tables for Contingency Matrix>Final Data>Infrastructure_Decision_Criteria_AHEB_EPVM.xlsx (page "LANCIS")

  2. In the metadata format i marked in yellow the fields that are necessary to fill Path in Dropbox: MEGADAPT_Yeowon>Sewee_netowork_october2017>Tables for Contingency Matrix>Final Data>Metadata_for_Infrastructure_decision_criteria_AHEB_EPVM.xlsx thanks

edithvilla commented 6 years ago

@duoai1206 @lancis-apc @heakin

hi yeowon, could you see the comments? do you have any questions about the comments?

duoai1206 commented 6 years ago

Hi Edith,

I see the comments. I will work on it within few days. Thanks for the reminder.

Yeowon

On Mar 16, 2018 9:02 AM, "Edith Villa" notifications@github.com wrote:

@duoai1206 https://github.com/duoai1206 @lancis-apc https://github.com/lancis-apc @heakin https://github.com/heakin

hi yeowon, could you see the comments? do you have any questions about the comments?

— You are receiving this because you were mentioned. Reply to this email directly, view it on GitHub https://github.com/sostenibilidad-unam/layers/issues/67#issuecomment-373760676, or mute the thread https://github.com/notifications/unsubscribe-auth/AZHc34i5QbTuL5tWI182AYf0Yq9IDA-9ks5te-IWgaJpZM4Rhtiq .

duoai1206 commented 6 years ago

@edithvilla @lancis-apc @heakin I addressed all the comments and questions in the Excel files.

edithvilla commented 6 years ago

@duoai1206 @heakin

@luis-supremo has reviewed the information you gave us and it's necessary that you send us the calculation report of your analysis, in order to complete the metadata

paola-gp commented 6 years ago

The calculation report or technical memory (difficult translation into English) is the documentation of the analysis. It allows for any person to recreate the results provided. It shows the specific inputs used (including the pre-processing of the data), method, assumptions, parameters, software specifications, results and their interpretation.