spacelab-ufsc / eps2

Electrical Power System 2.0
GNU General Public License v3.0
25 stars 6 forks source link

Hardware: Fix the battery header position #159

Closed mgm8 closed 2 years ago

mgm8 commented 2 years ago

The battery connector of the EM model is mounted on the wrong side of the board (for the GOLDS-UFSC satellite, the battery module will be installed under the EPS board, so the battery connector must be on the bottom side of the board).

eps-bat-header