spamlab-iee / os

An open source, cross-platform structural geology analysis software
GNU General Public License v3.0
25 stars 5 forks source link

Project saved with data from Excel doesn't load correctly #24

Open Saitodepaula opened 3 years ago

Saitodepaula commented 3 years ago

Hey Arthur, Marcos here (in english so that people from other countries can read it too)!

I've loaded data from an Excel file, each WorkSheet is data from one slope. In the first time, it loaded fine, I've loaded data from 12 worksheets in the same Excel file. But when I save the .openstereo file, and reopens it, all of the itens just reload from one or two worksheets (I know this when I right click the data and click PROPERTIES).

I've modified the Excel file between each use, so this may be a cause. But I think that if you add an option to reload the data completely, being able to choose the worksheet, it would be a lesser issue. Right now, the software let me choose to reload the file, but it doesn't give me an option to choose the worksheet again (SET DATA SOURCE and RELOAD options).