Closed Defi-Moses closed 2 months ago
The pull request introduces a new entry for the "Boba chain" in the paused-chains.json
configuration file. This entry specifies the parameters for pausing the chain, including the start and end times, as well as flags for disabling bridge and swap functionalities. The pause is scheduled from September 20, 2024, to October 10, 2024, due to chain upgrades, with relevant banner and warning messages defined.
Files | Change Summary |
---|---|
packages/synapse-interface/public/pauses/v1/paused-chains.json |
Added new entry for the Boba chain with attributes including pause timings, messages, and flags. |
In the meadow where the Boba chain lies,
A pause for upgrades, oh what a surprise!
With banners flying and swaps on hold,
Our little rabbit tale is now retold.
Hopping through changes, we dance with glee,
Awaiting the future, so bright and free! 🐇✨
Changes will increase total bundle size by 1.06kB (0.0%) :arrow_up:. This is within the configured threshold :white_check_mark:
Latest commit: |
fb5edd0
|
Status: | ✅ Deploy successful! |
Preview URL: | https://1511a26e.sanguine-fe.pages.dev |
Branch Preview URL: | https://feat-pause-boba.sanguine-fe.pages.dev |
All modified and coverable lines are covered by tests :white_check_mark:
Project coverage is 37.94554%. Comparing base (
89907ce
) to head (fb5edd0
). Report is 8 commits behind head on master.
:umbrella: View full report in Codecov by Sentry.
:loudspeaker: Have feedback on the report? Share it here.
Pause the boba chain while node upgrades take place
Summary by CodeRabbit
a876f5617a21a4d32aecd2c9ac936661ca5e4ede: synapse-interface preview link ca84c198b3850e3cefb5a5c7d484024339006607: synapse-interface preview link