When entering the July schedule, MR experienced an issue where only the first 22 days (~ 256 shifts) were entered. A test case needs to be developed to prove the problem, and then debugged. This is possibly an issue in the post, and possibly in the add controller
When entering the July schedule, MR experienced an issue where only the first 22 days (~ 256 shifts) were entered. A test case needs to be developed to prove the problem, and then debugged. This is possibly an issue in the post, and possibly in the add controller