Open ponceta opened 3 months ago
Add the possibility to select the scale of the labels export
When exporting labels for Werkplan, I prefer 1:250 as scale (instead of 1:500). Better results in urban area, where is not much place for many labels.
_Originally posted by @urskaufmann in https://github.com/teksi/wastewater/pull/294#discussion_r1669255677_
Illustrations if applicable.
Describe the new feature
List of requirements
Schemes, screen captures, or any other illustrations.
Provide a mockup of how it should look like
Feedbacks from the technical group
IF required, list the conclusions of the Feasibility study, options, alternatives and technical specificities
Mutualisation and possible impacts with other projects
IF available, link advanced specifications of the features required
Add a detailed timeline
Documentation links
Link and comments from the developer about the product
Conclusions from applicant, users or admins group
We can only export to scales that are in VSA DSS. I suggest waiting until the next major release, as the new SIA supports the scale 1:200
General information
Add the possibility to select the scale of the labels export
Users and administrators needs
When exporting labels for Werkplan, I prefer 1:250 as scale (instead of 1:500). Better results in urban area, where is not much place for many labels.
_Originally posted by @urskaufmann in https://github.com/teksi/wastewater/pull/294#discussion_r1669255677_
Graphical identity / Logo
Illustrations if applicable.
Description of users and administrators feature requirements
Describe the new feature
Requirements
List of requirements
Illustrations of the features and the requirements
Schemes, screen captures, or any other illustrations.
Graphical User Interface (GUI)
Provide a mockup of how it should look like
Technical analysis and specifications
Feedbacks from the technical group
Feasibility study
IF required, list the conclusions of the Feasibility study, options, alternatives and technical specificities
Risks and constraints
Mutualisation
Mutualisation and possible impacts with other projects
Specifications
IF available, link advanced specifications of the features required
Timeline / deadlines
Add a detailed timeline
Related softwares versions
Linked issues :
Documentation
Documentation links
Development and integration
Link and comments from the developer about the product
Conclusion
Conclusions from applicant, users or admins group