Closed karantsl closed 7 years ago
MW length and CW length include MO1, MO2 & CO1,CO2 respectively right now.
MO1, MO2, CO1 and CO2 values should be flexible.
The flow is as below ;
Say, Product Code = A10, MW Len= 3000 CW length = 2000 here by default Overhang is 50,50 ...which is editable. If without changing that you press SAVE, system will pop-up message suggesting overhangs.
Overhangs shall be kept flexible without constraints while inputting the value. We are willing to provide overhangs of any length as desired by the customer.
there is no constraint Karan...you are free to put any overhang but as suggested by system. coz then only Calculation for No. Of wires can be integer. customer can demand any overhang but if product code is selected then you have to choose from the option. The thing which you are asking,may come in BOM,in which you can play with Spacing and overhang.
Understood this Sir. Thanks
MW length and CW length should include MO1, MO2 & CO1,CO2 respectively which is not the case right now. Also MO1, MO2, CO1 and CO2 values should be flexible.