Issue:
When adding a review, you can add the date 29 January 2001. However, as 2001 is not a leap year, 29 January does not exist. An error or warning should be fed back to the user to signal an invalid date.
To reproduce:
radd s/1 d/29/01/2001 c/TEST r/1
Expected Output:
Some kind of error signalling invalidity of date
Issue: When adding a review, you can add the date 29 January 2001. However, as 2001 is not a leap year, 29 January does not exist. An error or warning should be fed back to the user to signal an invalid date.
To reproduce:
radd s/1 d/29/01/2001 c/TEST r/1
Expected Output: Some kind of error signalling invalidity of date
Actual Output: Review is added