Open tnjtr2 opened 3 months ago
[x] Existing PB in the median removed/replaced?
[x] As-built describes ground connection continuing to join next SL south, but what about the conduit which goes to HH?
[x] What happens to the conduit connection east of SL 3545 on Blackhawk?
[x] New SL cabinet is metered, and from MG&E
[x] Were the old lights at the intersection powered by the signal cabinet
[x] NE corner luminaire was powered by the SL Controller on Deming Way
[x] they are all TLM-E05-LED-E1-SL3-8030-AP-DIM
[x] SL to the south is removed from Alliant circuit. URD at the corner is Alliant. Update utility spreadsheet.
Assuming they were powered by the signal cabinet, the three luminaires at the intersection are from the metered signal cabinet, so exclude those from wattage changes
Removal Date: 7/14/2023 Installed Date: 6/4/2024