Closed sarahmonster closed 5 years ago
DONE!
Three coats of Bona Mega, so they should be super protected, but we can do a top-up coat after gthe cupboards are in if we want. According to the technical data sheet, the floor should be 70% cured after one day, 90% after three days, and 100% cured in a week. That means that we can start doing things (installing stuff, using ladders, etc) in there Friday morning, and by Tuesday morning it'll be pretty much bulletproof. 🍻
Goddamn that is so fucking cool.
Floors were sort of fixed, then I fixed the fixing. Used Bona Gap Master in the gaps between floorboards (in black). Primed with Zinsser BIN (~2.5L), tinted as dark a grey as possible (mid-grey) and then painted two coats of Little Greene floor paint in Lamp Black (~3L).
https://www.littlegreene.com/media/wysiwyg/Floor_Paint_2014.pdf
Next up is stenciling (can start Tuesday), followed by two or three coats of Bona Mega.