Open lixunweb opened 6 months ago
When I switched the period to 1D, the date on the timeline was one day ahead of the real data
When I switch the period to 1D, 1W, and 1M, the date of the timeline is one day earlier than the real data, but the data of the switching period S, m, and h is normal
When I switched the period to 1D, the date on the timeline was one day ahead of the real data