Closed trainfarb closed 7 months ago
This explains the thought process behind why we’re onboarding 10 unrelated teams in a single platform: https://youtu.be/0-1Qm5xWDG4?si=eAbVYEzkdQ-cgIWx
Project Plan is focused on creating the IDP3 so people can focus, increase productivity, and become more creative: https://youtu.be/p4ZfkezDTXQ?si=h9hh4qnHPYgHdTXX
This highlights the gaps we’re filling. daoTeaching/polymathProcess is helping people do all of this on their own from the ground up. https://youtu.be/KrixUt0YQO0?si=R921SEfUgB-goGBS
https://youtu.be/hucGTRuKNQ8?si=7MWE855Y_n0j9XtQ sales funnel
Problem definition is how people onboard 0.9.1 https://youtu.be/IgetBrY7lhE?si=UuFb_NlFatM09taS
IDP is meant to machine everything for wellness center property managers: https://youtu.be/cQQIikIAiSE?si=ULZ-e63eBUgf-Ecg
Song to introduce trainfarb. Use as beat for this 28-day beatDrop https://open.spotify.com/track/1m9TZ1dpYEQnczSsI6z9Ku?si=Da8X4B_OR1iAORgUG1LOtA
Video: Platform as a Product - Manuel Pais - PlatformCon 2022 (https://youtu.be/b8YHCDMxqfg?si=MuzCpbujgqULUOId)
Updated Meeting Memo after watching Platform as a Product video:
Wanted to check and see if anything I did into day's sketch relates to logistics. The logistics plan will have a stronger focus in a few months, but for right now, don't put too much effort into it. Today, the main focus was the 8.1.1 Work Breakdown Structure and the 8.1.2 Schedule: https://vertexeng.com/insights/how-construction-site-logistics-planning-smooths-project-success/
Question: Where do photos get saved on the drive?
Wellness wallet: What positive behaviors have I changed or maintained today?
40 minutes: Start Day Updating Meeting Memo while watching "Platform as a Product - Manuel Pais - PlatformCon 2022" (Link and images in comments)
250 minutes: Sketch, Populate, and Color v0 of a Visual 28-Day Internal Developer Platform (IDP3). Work Breakdown Structure, Schedule, and Logistics Plan (Responsibility Assignment Matrix) on a single sheet.
30 minutes: Add video explaining IDP to Instagram
22 minutes: Upload images and videos of IDP3 Creation Process to Google Drive Folder
33 minutes: Create Work Breakdown Structure for Onboarding Platform Launch in IDP3
MM minutes: Write debrief of the day and send to cohort clients
Create a dedicated tab in this IDP3 as the work breakdown structure.
Add schedule view to IDP3 to track over 28-days as onboarding
Create a quick sketch of how each platform contributes on a 2D model of a city block