Closed travisgoodspeed closed 6 years ago
The bottom slot cut interferes with through hole plating. I'll send the PCB manufacturer an updated Gerber.
Updated designs have been pushed to the repo and sent to the manufacturer.
The first batch of 141 PCBs have shipped from Wuhan, to arrive on Monday.
Boards have arrived. If you see me cussing on Twitter this evening, it's because of those 0201 capacitors.
Layout errata:
(Check when fixed in GoodWatch11 layout.)
The LCD is lighting up.
The first development prototype is now functional. Closing this issue.
Use this issue to track the PCB manufacturing and initial assembly. Close when the design is complete and we move on to the '11 or '20.