uf-mil-mechanical / tasks

📝 Tasks/info related to mech team
0 stars 0 forks source link

Strip and Hang Sub8 #13

Open adamhamdan8 opened 2 months ago

adamhamdan8 commented 2 months ago

SubjuGator 8 needs to be hung up as display in the lab. Before this happens, the main tube needs to be taken apart and stripped down. This requires some understanding of the tube, just to ensure nothing is broken during disassembly. Finally, some discussion needs to happen with the electrical team to see what they may want to keep/discard.

Then Emily will need to be hung up on the rafters with the other boats and submarines. Doing this will require getting chains and a ladder to properly hang up, as well deciding on a final location with leaders

adamhamdan8 commented 2 months ago

The back half of the tube so far has been disassembled, with the computer being completely removed.

adamhamdan8 commented 2 months ago

I completely disassembled the main tube, and the sub is basically reading for hanging. I left the entire power electronics system on the electrical bench and I took apart the water cooling tubing and fittings as well. Going to assign this to a mechanical member after this so that they can hang it up in the rafters

adamhamdan8 commented 2 months ago

Being put on hold, not a very urgent task, we have props to make first!

adamhamdan8 commented 2 weeks ago

Sub is ready to hang whenever somebody wants to pick this up