Closed dirtyformal closed 3 years ago
This is a part of the wider changes as promulgated in AIC 25 MAR 21. This is also related to the withdrawal of the Waiuku (WI) NDB - Issue #77.
As opposed to WINB, SYNB will not be replaced with a new waypoint.
This amendment is due to be effective from 17 JUN 21 (AIRAC 2106).
To-do List
Airspace.xml
NAVAID.xml
Enroute Procedure Changes Remove the following, with no replacement.
There are a large number of Ardmore (AR) procedure changes that will be captured under a separate issue (TBC).
Issue no longer necessary due to the withdrawal of subject NDB being put on hold.
This is a part of the wider changes as promulgated in AIC 25 MAR 21. This is also related to the withdrawal of the Waiuku (WI) NDB - Issue #77.
As opposed to WINB, SYNB will not be replaced with a new waypoint.
This amendment is due to be effective from 17 JUN 21 (AIRAC 2106).
To-do List
Airspace.xml
andNAVAID.xml
.Enroute Procedure Changes Remove the following, with no replacement.
There are a large number of Ardmore (AR) procedure changes that will be captured under a separate issue (TBC).