Generally operators seem to max out diversions to canals from rim reservoirs when spilling for flood control purposes. For each rim reservoir, therefore, there should be some logic that both 1) maximizes release to canals during flood control spill and 2) accounts for this in rim reservoir flood control logic.
Generally operators seem to max out diversions to canals from rim reservoirs when spilling for flood control purposes. For each rim reservoir, therefore, there should be some logic that both 1) maximizes release to canals during flood control spill and 2) accounts for this in rim reservoir flood control logic.