Closed Smartrician closed 10 months ago
I have a few clients on 3 phase grid, but only uses 1 phase for the Victron equipment / power property.
I have added a Victron charge point, would like to charge car on 3 phase during night time cheap rate.
Then during the day, switch back to single phase but with Auto EVCP mode for excess sun.
I have setup the auto modes in node red nicely, just stuck on switching the EVCP from single phase to 3 phase with a node.
Could this switch be added to the EVCP node please?
Thank You
With the current EVCS this is not possible. The hardware cannot control the phases independently, which is needed to do what you want.
I have a few clients on 3 phase grid, but only uses 1 phase for the Victron equipment / power property.
I have added a Victron charge point, would like to charge car on 3 phase during night time cheap rate.
Then during the day, switch back to single phase but with Auto EVCP mode for excess sun.
I have setup the auto modes in node red nicely, just stuck on switching the EVCP from single phase to 3 phase with a node.
Could this switch be added to the EVCP node please?
Thank You