According to the UG, the criteria is the parameter placed after the field. However, the activity diagram seems to be checking the criteria validity twice - once at valid criteria is provided and once at specified integer is a number between 0 and 2147483647
According to the UG, the criteria is the parameter placed after the field. However, the activity diagram seems to be checking the criteria validity twice - once at
valid criteria is provided
and once atspecified integer is a number between 0 and 2147483647