wmo-im / wis2-transition-guide

WIS2 Transition Guide
https://wmo-im.github.io/wis2-transition-guide
Apache License 2.0
1 stars 4 forks source link

Maintenance of WIS1 and GTS #7

Open hhaddouch opened 11 months ago

hhaddouch commented 11 months ago

Maintenance and operation of MSS : MTN RTH GTS nodes

The purpose of this Issue is to provide guidance on the maintenance of Message switching system during the transition phase