Closed sbillinge closed 6 years ago
Harvest Technical commissioning UCs from Milinda's planning doc
save them as UCs on mission-control encode them with issues on mission-control link the issues to milestones on mission -control
Harvest Technical commissioning UCs from Milinda's planning doc
save them as UCs on mission-control encode them with issues on mission-control link the issues to milestones on mission -control