Since #24 it was no longer possible to track weekends because it where skipped. With this PR it's possible to track them when you specify a range with ONLY weekends days or a specific day in the weekend.
E.g:
Assume that the 20th of September is Saturday
/t 20-21 will track Saturday and Sunday on the default project
/t 20 will track Saturday on the default project
Since #24 it was no longer possible to track weekends because it where skipped. With this PR it's possible to track them when you specify a range with ONLY weekends days or a specific day in the weekend. E.g:
/t 20-21
will track Saturday and Sunday on the default project/t 20
will track Saturday on the default project