With the addition of a grid interconnection limit, it will be nice to have the battery controller consider this limit when dispatching.
-
I just tried running the contingency analysis application using the Polish network and it fails after running a few of the contingencies. I think this is because the PETSc solver is failing but the re…
-
Request to add a stand-alone device that uses power electronics for volt-var control. Varentec has a product like this.
Open questions:
1) How detailed should it be?
2) Should we look at a delt…
-
The older power flow models in the test folder need some clean up.
All of them are using the ID number for connections, some use numbers for names, and most are using voltage_A (even if there is n…
-
Improve the performance by skipping residential objects if the change in voltage values (voltaged[x]) in triplex meter is below a certain threshold. The user should be able set the threshold.
Requi…
-
Improve the performance by skipping residential objects if the change in voltage values (voltaged[x]) in triplex meter is below a certain threshold. The user should be able set the threshold.
Requi…
-
The older power flow models in the test folder need some clean up.
All of them are using the ID number for connections, some use numbers for names, and most are using voltage_A (even if there is n…
-
Hey, thanks for making this. I was using this for a few months when I just had my battery storage installed and it worked great. My inverter, a Sol Ark 12k, provides combined power usage variables f…
-
Some users need to prevent events from being called until a particular update time, e.g., external implementations of market clearing mechanisms. It's usually easy to block events within the handlers…
-
Request to add a stand-alone device that uses power electronics for volt-var control. Varentec has a product like this.
Open questions:
1) How detailed should it be?