Noticed that the NPV at the end is high negative. Think the reason is that "Leistungen" is way to low.
In the picture: left is the code, middle is the .csv with "leistungen" around 700k, right are the variables after "make variables" and "Leistungen" ist just around 0.1.
Noticed that the NPV at the end is high negative. Think the reason is that "Leistungen" is way to low.
In the picture: left is the code, middle is the .csv with "leistungen" around 700k, right are the variables after "make variables" and "Leistungen" ist just around 0.1.