DRT embraced the spirit of the 18F challenge from the beginning. We understand that for the government to bring efficient, user-centric digital services to the American people at scale, it must partner with industry. And we understand that good partnership means both sides working for each other. DRT was prepared to submit on the government’s original schedule, ultimately deciding to hold to that original 26 June deadline. Our beta is presented at the link above, and is well on its way to being an MVP that enhances American’s interaction with the government’s available food safety data.
Geoff Dick was our product owner, with ultimate accountability for delivery. Geoff has over 15 years of experience delivering user-centric digital products in the commercial and federal sectors.
The DRT 18F ADS 1 development team has demonstrated experience bringing improved digital services to Americans. We are compriseda of seasoned products managers, developers, and designers who both work and play in this space.
The prototype is deployed on Heroku, a Platform as a Service (PaaS) provider. The URL is http://foodrecallgateway.herokuapp.com/.
The DRT dev team wrote unit tests using Jasmine (a behavior-driven development framework). These unit tests executed local developers' environment prior to executing a pull request. The unit tests are located in the Github repository: https://github.com/DRTforGSA18F/FoodRecallGateway/tree/master/test.
Additionally, Travis-CI executed tests for each build.
The DRT development scheme integrated GitHub with Travis-CI to achieve continuous integration (CI), and integrated with PaaS provider Heroku for continuous deployment. The CI system executed tests for each pull request and merged to the master branch. Once the CI passed on the master branch the application was automatically deployed to foodrecallgateway.herokuapp.com.
The DRT configuration management approach leveraged the Git code repository to manage code changes, pulls, and merges. We applied a tag/label for the prototype deliverable on 25 June 2015.
The DRT team integrated New Relic APM and BROWSER instances to monitor and understand the site's performance from the end-user perspective.
The DRT team leveraged the light-weight Linux container, Dyno.
DRT completed our BETA prototype within the original RFQ POP of 17 to 26 June. We embraced the very limited timeframe as an opportunity to innovate, and designed and employed a hybrid agile approach which combined the Scrum methodology with a Kanban-like continuous development model. In order to facilitate this fluid approach we used the Trello product management tool and designed a simple, continuous-flow project board, with the following components: Epics>Product Backlog>Sprint Backlog>In Progress>To Verify>Done.
The development team had complete authority to advance work across the board up to the "To Verify" stage. At that point the Scrum Master would coordinate and conduct testing/verification. Once verified, the Scrum Master would move the work product into the "Done" stack.
This simple design gave real authority to our development team to choose and advance product backlog, an approach we felt critical given the limited timeframe, and one we were comfortable with based on a cohesive, user-focused dev team.
That one basic gate we employed between "To Verify" and "Done" was a simple, lightweight method to ensure that the Scrum Master and Delivery Manager would have the ability to provide oversight and employ final authority. The simple design of the Trello board also allowed our Scrum Master and Delivery Manager to watch the entire Sprint in real-time, commenting and working with the development team as they observed product flow across the board, and choosing when to conduct usability tests.
Our User-Centered Design approach included Initial Design (A/B) testing, Application Usability testing at multiple steps, and Accessibility (508) testing.