Closed hawea closed 11 years ago
@hawea check resolved and close. Note that I linked to the drawing record as may contain more than 1 file.
Also note, have not replicated this functionality in task to material though easily could. Assuming that drawings of material only needed when choosing materials and not needed for construction etc?
I agree, I think we leave it off the materials table for now. Will keep this in mind though. Cheers Hawea
Hi Andrew,
I have noticed that we don't have a way of linking through to the respective drawings from the task.
I think the logical place to put this link is against the Assemblys in the TaskToAssembly admin view. i.e. http://dev.melbourne.wcewm.co.nz/TaskToAssembly/admin?task_id=12
Please contact me to discuss further if required.
Thanks Hawea