Closed dianamartin closed 1 year ago
Check with Allyson and Brian to determine who manages the ETJ in the Wells Branch Area (currently, no signal engineer is assigned to that area).
Need to assign these signals to the NORTHEAST Engineering Area.
@ChristinaTremel we need to give this to the Geo team to expand the Signal Engineer Area for the 2 mile ETJ
@dianamartin Does the entire 2mile ETJ need to be used or do adjustments just need to be made for the Signal Engineer Area to include these signals?
@andrewshensky I don't think the whole 2 mi ETJ is needed, just for that Northeast
corner
I have expanded the Signal Engineering Area in the Northeast corner. This data has been updated in maint and pushed to DM. I will submit a ticket to CTM to see if they can go ahead and pushed that data to AGOL, so it will be reflected prior to the next update cycle
Checked the TRANSPROTATION_signal_engineer_areas in AGOL and saw the Wells Branch ETJ area added to the polygon. QCed the signal ID's noted in Data Tracker above in Allyson's request and they now have Engineer Area = NORTHEAST
, as requested.
Messaged Allyson:
Hey! Just checked and the Wells Branch Corridor signals are now updated with the NORTHEAST Engineer Area!
She responded:
thank you!!
Allyson R. AMD
Emailed 3/31
Signals Missing Engineering Area