cityofaustin / atd-data-tech

Austin Transportation Data & Technology Services
18 stars 2 forks source link

[EPIC] OCE Inventory Tracking System #12553

Open atdservicebot opened 1 year ago

atdservicebot commented 1 year ago

This epic tracks the work performed to implement a KNACK app for OCE's concrete mix inventory.

Name saroj t.

What application are you using?

Other / Not Sure

Describe the problem.

OCE is currently keeping track of their inventory systems via a excel sheet. They would like to have it so it sends an email when ever the mix is about to expire.

Sometimes the inventory is expires and they have to wait for another batch to arrive.

The file name is: Pre-approved & IDIQ HMAC Mixes - (\Coacd\dfs\PWD\Street & Bridge Division\Office_of_City_Engineer\Engin_Stndrds_Review\MATERIALS REVIEWS\2_HMAC)

Describe the solution you have in mind.

When those mixes are about to expire, we would like to send it to the producer to let them know that the mixes are about to expire. 3months prior expiring, 1 week before expiring and when it expires.

How will we know that our solution is successful?

We are able to send an email

Also the mixes are not expiring

Users

  • Saroj T
  • Michael K.
  • Anna M.
  • ocematerialreview email

Sponsorship

Office of the City Engineer

Which Strategic Direction 2023 “Mobility” indicators would this new application impact?

['System efficiency and congestion']

Which Austin Strategic Mobility Plan goals would this new application support?

['Placemaking — Build a transportation network that encourages social interaction through quality urban design, and connects users to the many places that make Austin unique.', 'Economic Prosperity — Promote economic growth for individuals and the city through strategic investments in transportation networks that meet the needs of the 21st century.', 'Innovation — Draw inspiration from forward-looking cities around the world, change the way we think about what’s possible, and set an example for the rest of the country.']

Describe any workarounds you currently have in place or alternative solutions you've considered.

None

They have to send the emails manually

Is there anything else we should know?

This is not an emergency

How have other divisions/departments/cities addressed similar challenges?

Unknown

Requested By Saroj T.

Attachment (32.34kb)

Request ID: DTS23-108155

dianamartin commented 1 year ago

6/12

Synced with Christina on this, we thought that maybe this might have to do with Dan V's request for a PWD inventory tracking project. We ended up mapping out SBO<>SMD relationship in the event that this request needed to create a new application. Christina will reach out to the stakeholders and scope what they need long term. Matt M. let me know in the meeting I was in with him that this engineering group manages over SBO materials and have a spreadsheet they track the mixed materials. They have an expiration date and want to know 3 months in advanced of the expiration and when Matt saw the ability in Knack to send emails based on a field he let the stakeholders know. They had apparently asked him to assist and they were told by the former IT group that their request was too small.

dianamartin commented 1 year ago

9/11 Diana's Notes

Participants: Saroj T, Michael K, Anna M, Jeebika S

Mixed Design: City of Austin Projects

First thing, manual to SharePoint

Creating own system

Started to make a Power Automate App

Walk through process

Published PDFs

Questions:

Contracts - don’t deal with those contracts

Is there existing information? How would a Producer know what to do?

Flex Base Material

Current Process

Construction Management group

They created a resource account?

One stop place

G drive: (link)

ChristinaTremel commented 1 year ago

Meeting Notes 9/11

Attendees:

Saroj T, Michael K, Anna M, Jeebike S, Diana M, Christina T. Darren D helps with base materials and it would be good to include him in the future. Would also like Robert to be included.

Current Process

Current files:

Future Process Criteria (Top Priorities)

Next Steps:

TracyLinder commented 1 year ago

Prototype Work Sesh Scheduled: 10/10/23

Diana, Tracy

TracyLinder commented 1 year ago

Stakeholder Update Meeting Scheduled for 10/24/23

TracyLinder commented 1 year ago

Update 10/10/23

TracyLinder commented 10 months ago

New Questions for Stakeholders:

susannegov commented 10 months ago

1/22

I wrote down what the schema from the spreadsheet would look like in theory. Excel File link

stockpile_results table

Field Name Type Description
Stockpile Result ID Auto-Increment Unique identifier
Sampling Date Date/Time mm/dd/yyyy
Testing Agency Multi-choice Drop down. Allow to add a new option
Material Description Multi-choice Drop down. Allow to add a new option
Stockpile Location Multi-choice Drop down. Allow to add a new option
Plant Name Connection The plant location name
Stockpile ID Short Text ID is per plant location
Gradation 1 3/4 Number Decimal
Gradation + 7/8 Number Decimal
Gradation + 3/8 Number Decimal
Gradation +4 Number Decimal
Gradation + 40 Number Decimal
Gradation+ 200 Number Decimal
Optimum Conditions Dry Unit Weight Number Decimal
Optimum Conditions Moisture Number Decimal
Compressive Strength 0 Lat Pr Number Decimal
Compressive Strength 3 Psi Lat Pr Number Decimal
Compressive Strength 15 psi Lat Pr Number Decimal
Liquid Limit Number Decimal
Plastic Limit Number Decimal
Plasticity Index Number Decimal
Wet Ball (Mill) Number Decimal
Increase in 40 Number Decimal
Created By Connection accounts
Created Date Date/Time mm/dd/yyyy
Modified By Connection accounts
Modified Date Date/Time mm/dd/yyyy
TracyLinder commented 8 months ago

Sync Tracy & Susanne 3/7/2024

List of Major Use Cases (features) to be tested:

  1. Add a new producer
    • [ ] Setup what fields required
    • [ ] A confirmation that attachment has been submitted
  2. Create a new mix for each of the 3 types
    • [x] Add filter menu between active/expired instead of two tables
  3. Create expiration notifications for batches
  4. Create a new plant
TracyLinder commented 8 months ago

Q: Why do we have a status comments field? Q: Should user be able to edit mixes from the producer page? (They are able to add attachments) Q: Should user be able to add a new mix from the approved mixes page? Q: Clarify which mix types require a plant.

susannegov commented 8 months ago

To do