cityofaustin / atd-data-tech

Austin Transportation Data & Technology Services
17 stars 2 forks source link

Add the CPO's Mobility Bond Review Process to Certain Folders in AMANDA #1521

Open atdservicebot opened 4 years ago

atdservicebot commented 4 years ago

As a Corridor Program Reviewer, I need my review process (The Mobility Bond Review Process (51093)) added automatically to certain folders in AMANDA, so I can document my review.

Stakeholders: Gregory P DTS Manager: Nate

Updated Acceptance Criteria:

Waiting for Greg to get info on this last one:

Request Date: 2018-12-14 17:20:00

Request ID: DTS18-103345

Status: Backlog

Customer Priority: 0

Level of Effort: Minor

DTS URL: https://atd.knack.com/dts#service-requests/view-issue-details/5c143ad37eb1fd0863b146e8 Migrated from atd-amanda #50

atdservicebot commented 4 years ago

From TracyLinder on 2019-10-24:

I spoke to Greg Pepper about this today (he will be the primary SME). Prior to development we will need to confirm which folders this has already been developed for, and what still needs to be done.

amenity commented 4 years ago

@TracyLinder - please circle back with Greg on this.

TracyLinder commented 4 years ago

Add the process at folder initiation to allow CPO to add comments as needed. Let's get some more feedback from Greg Pepper on what he hopes this will accomplish. Also limit the scope of this to RW and EX.

Nadin-Nader commented 3 years ago

Sent email to Kim, Paloma and Greg to see when we could get together and define all of requirements and acceptance criteria for this change;

Hello Everyone,

I hope you are all doing well. I am reaching out to you in regards to an issue that I am trying to finish out the scoping and acceptance criteria, 1521 Add CPO Review Process to Certain folders in AMANDA.

I was wondering if we could have a meeting to go over this and get the ball rolling if it is still wanted. I looked at the calendar and saw that everyone had 10am and 12pm open on Monday September 28th. Please let me know if this works for everyone. If it does not, I also see an opening on Tuesday the 29th at 11am. Please let me know what time works best for you so that we can get work started on this.

Just to keep everyone in the loop, So far i have the following as acceptance criteria and questions that need clarification:

Add the Mobility Bond Review Process at folder initiation Reviewer should be able to make comments as needed, should be able to after folder initialization Mobility Bond Review process needs to be added to: The UC folder – All SubTypes SCP folder- as needed with the info tab y/n; What do you mean by as needed? LM folder - (already working w/ Andy to make this happen) Is this still being worked on with Andy? EX- All new installations in the corridor area RW - Long term closures in the corridor area Which folder has this already been developed for or what work has already been done? Are we limiting this to only RW and EX folder? What else will this change accomplish or need to accomplish?

Respectfully,

Nadin A. Nader IT Business Systems Analyst Data and Technology Services Austin Transportation Department

Nadin-Nader commented 3 years ago

Response from Greg Pepper on 10/5/2020 see attachment:

https://app.zenhub.com/files/140626918/5e1b7e8c-7efa-4a60-a719-a7156e59eb72/download Mobility Bond Review process needs to be added to: The UC folder – All SubTypes If Info tab Mobility Bond Review 76706is clicked Yes, then add Mobility Review process and add to Reviewer task list.

Process: 51093 Mobility Bond Review (insert) Needs to allow a document to be created

Mobility Review Document needs to be part of the doc merge of the UC-Master Report Document

SCP folder- as needed with the info tab y/n; What do you mean by as needed? Same as above. If the info for “Mobility Bond Review” is clicked yes on info tab, then add the review and reviewer to the process tab, reviewer task list, and the document tab and the doc mere for the Master Comment Report. LM folder - (already working w/ Andy to make this happen) Is this still being worked on with Andy? (Double check. We are getting added, but probably still automation issues and Master Comment Report Doc Merge issues. EX- All new installations in the corridor area To ROW MGMT: Manual Entry? Are we asking for some GIS auto entry here? RW - Long term closures in the corridor area To ROW MGMT: Manual Entry? Are we asking for some GIS auto entry here? Which folder has this already been developed for or what work has already been done? Are we limiting this to only RW and EX folder? What else will this change accomplish or need to accomplish?

TracyLinder commented 3 years ago

Which folder has this already been developed for or what work has already been done?

@Nadin-Nader please setup meeting & invite me. Thanks!

TracyLinder commented 3 years ago

@Nadin-Nader be sure to invite Kim or Isabell Pena to the meeting; we'll need ROW's input.

Nadin-Nader commented 3 years ago

Status:

Meeting set for November 9, 2020 Sent invite to Tracy, Greg, Kim and Isabel

TracyLinder commented 3 years ago

Status: Scoping meeting to take place during sprint 37.

Nadin-Nader commented 3 years ago

**Old acceptance criteria/notes:

Acceptance Criteria - More TBD Add the Mobility Bond Review Process at folder initiation Reviewer should be able to make comments as needed, should be able to after folder initialization Mobility Bond Review process needs to be added to: The UC folder – All SubTypes SCP folder- as needed with the info tab y/n; LM folder - (already working w/ Andy to make this happen) EX- All new installations in the corridor area RW - Long term closures in the corridor area

Older notes:

Description: Mobility Bond Review process needs to be added to: The UC folder - All of Them. SCP folder- as needed with the info tab y/n LM folder - (already working w/ Andy to make this happen) EX- All new installations in the corridor area RW - Long term closures in the corridor area

Nadin-Nader commented 3 years ago

Had scoping meeting with Greg and Izzy. Greg said that they would like AMANDA to insert the Mobility Bond Review process automatically to the EX and any RW folder with the SubType of TURP and FILM if it is chosen by the Reviewer/Permit Analyst. If selected, the Mobility Bond Process will be inserted as a Mandatory field. It will also need to be assigned to Greg Pepper and the end date should be 5 business days from when assigned. Greg also mentioned that he would also like for the Mobility Bond Review to be added automatically via GIS. He will send the Layer needed.

Updated Acceptance Criteria:

Waiting for Greg to get info on this last one:

Nadin-Nader commented 3 years ago

@TracyLinder updated the acceptance criteria with what Greg wanted. Please review and let me know if there may be something else needed

TracyLinder commented 3 years ago

Still a need.

TracyLinder commented 1 year ago

This is still a need; pepper says it's related to the CIP needs. Also project connect. The need is to be able to either add reviewers manually, then eventually have the system assign this based on GIS data.