issues
search
clamsproject
/
app-swt-detection
CLAMS app for detecting scenes with text from video input
Apache License 2.0
1
stars
0
forks
source link
issues
Newest
Newest
Most commented
Recently updated
Oldest
Least commented
Least recently updated
releasing 5.0
#101
marcverhagen
closed
1 week ago
6
fix hardcoded 94 min limit on positional encoding
#100
keighrim
opened
3 weeks ago
0
Merging CLI code
#99
marcverhagen
closed
3 weeks ago
0
Merging in CLI code
#98
marcverhagen
closed
3 weeks ago
0
Add CLI capabilities
#97
marcverhagen
opened
1 month ago
1
One view or two views?
#96
marcverhagen
closed
3 weeks ago
8
increase default value for `stopAt` parameter
#95
owencking
closed
3 weeks ago
3
adding new models after positional encoding fix
#94
keighrim
closed
1 month ago
0
release candidate for v4.3
#93
keighrim
closed
1 month ago
0
fixed sinusoidal encoding bug
#92
keighrim
closed
1 month ago
0
fixes possible disparity in sampling rate and actual sampling
#91
keighrim
closed
2 months ago
0
sampled timepoint gaps are vastly off from set frame sample rate
#90
keighrim
closed
2 months ago
0
decoupling "postbin" and evaluation from training code
#89
keighrim
closed
2 months ago
0
TimePoint outputs now include softmax for `NEG` label
#88
keighrim
closed
2 months ago
0
app reports no score for "negative" label
#87
keighrim
closed
2 months ago
0
Optimizing video seek time for still image extraction
#86
keighrim
closed
2 months ago
2
startAt and stopAt parameters not honored
#85
owencking
closed
2 months ago
1
Record all parameter values (including defaults) in output MMIF
#84
owencking
closed
2 months ago
2
option to turn OFF stitcher
#83
keighrim
closed
2 months ago
0
added logging of computation times
#82
keighrim
closed
2 months ago
0
Releasing 4.1
#81
marcverhagen
closed
2 months ago
0
App outputs non-exiting MMIF version
#80
keighrim
closed
2 months ago
1
allowing multiple models via a runtime param
#79
keighrim
closed
3 months ago
0
App versions and model versions
#78
marcverhagen
opened
3 months ago
1
Hard-coded basic categories
#77
marcverhagen
closed
2 months ago
2
Add a parameter to turn off the stitcher
#76
marcverhagen
closed
2 months ago
0
Releasing 4.0
#75
marcverhagen
closed
3 months ago
0
Releasing 4.0
#74
marcverhagen
closed
3 months ago
0
Slight disconnect between app sample rate and annotation sample rate
#73
marcverhagen
opened
3 months ago
0
Use post binning labels in classification
#72
marcverhagen
closed
2 months ago
2
Add parameter for saving all TimePoints
#71
marcverhagen
closed
2 months ago
1
Sort timeframes and timepoints in output
#70
marcverhagen
closed
3 months ago
0
classifier is very slow
#69
keighrim
opened
3 months ago
6
misspelled property name
#68
marcverhagen
closed
3 months ago
0
Warnings written to console when running SWT
#67
marcverhagen
opened
3 months ago
0
Releasing v3.0
#66
marcverhagen
closed
3 months ago
0
Post-binning stitcher error
#65
marcverhagen
closed
3 months ago
0
Deal with configurations without pre-binning
#64
marcverhagen
closed
3 months ago
1
Model update for v3
#63
keighrim
closed
3 months ago
0
Change the MMIF output using TimePoints and TimeFrames
#62
marcverhagen
closed
3 months ago
2
evaluation of stitcher
#61
keighrim
closed
3 months ago
2
Allow multiple models
#60
marcverhagen
opened
4 months ago
9
Post binning from the app
#59
marcverhagen
closed
2 months ago
1
Separate training and evaluation
#58
marcverhagen
closed
2 months ago
0
Fixing post binning for the classifier
#57
marcverhagen
closed
4 months ago
0
Removing a fatal error in 2.0
#56
marcverhagen
closed
4 months ago
2
ConnectionResetError when building the image
#55
marcverhagen
closed
3 months ago
3
Version 2.0 is broken
#54
marcverhagen
closed
4 months ago
1
New SWT model
#53
marcverhagen
closed
3 months ago
1
Add representative frames
#52
marcverhagen
closed
3 months ago
1
Next