As a Galasa user, I want to know that the DB2 Manager is being tested in the regression suite on a daily basis, so that I can be sure the DB2 Manager functions as expected.
Background
The Db2ManagerIVT was written when the DB2 Manager was being developed, but an integration test that invokes the Db2ManagerIVT was never written and added to the testcatalog. Therefore, testing of the DB2 Manager has not been done since the Db2ManagerIVT would have been written and ran locally in 2022.
Tasks
[ ] First fix the defect described in story #1850
[ ] Obtain a DB2 instance to test against
[ ] Run the Db2ManagerIVT locally to ensure it works locally
[ ] Write a new test for the integratedtest repo that invokes the Db2ManagerIVT
[ ] Ensure this new inttest has been added to the testcatalog when the integratedtests repo is rebuilt
[ ] Ensure this new test is therefore ran daily as part of the regression suite
Prerequisites
Story #1850 needs to be resolved first.
Story
As a Galasa user, I want to know that the DB2 Manager is being tested in the regression suite on a daily basis, so that I can be sure the DB2 Manager functions as expected.
Background
The Db2ManagerIVT was written when the DB2 Manager was being developed, but an integration test that invokes the Db2ManagerIVT was never written and added to the testcatalog. Therefore, testing of the DB2 Manager has not been done since the Db2ManagerIVT would have been written and ran locally in 2022.
Tasks