Especially for the EXECUTIONDURATION, it would be very interesting to have different limit. Indeed, generally we want a sync job to run much less than async jobs. Since in both modes the user can change this parameter up to a maximum value, it would be nice if this maximum limit is less than for async jobs.
Especially for the
EXECUTIONDURATION
, it would be very interesting to have different limit. Indeed, generally we want a sync job to run much less than async jobs. Since in both modes the user can change this parameter up to a maximum value, it would be nice if this maximum limit is less than for async jobs.